Gallery 1

2016 - Dialysis Clinic, Inc.

Construction of the parking lot and all structural concrete for the building, all earthwork, concrete, and paving.

Site Content

2016 - Mill Machine

Construction of a new 60 x 100 steel building manufactured by R & M Steel Buildings. This project included a radiant heat slab, office, high glass windows, concrete bollards, and aprons. Included, a parking lot expansion and moving an existing shop. The existing shop was placed adjacent to the new building on a raised concrete foundation.

Site Content

2016 - UC Branch Center Remodel

A commercial project consisting of a remodel on the UC Branch Center, both interior and exterior. We removed precast exposed aggregate concrete panels and replaced them with structural steel and glass. The interior rooms were remodeled with new ceiling tiles, flooring, interior door modifications, and a kitchenette was installed.

Site Content

2016 - Burger King Hamilton

Construction of the parking lot and all structural concrete for the building, all earthwork, concrete, and paving.

Site Content

2016 - Thompson Falls Airport Fuel Tank Removal and Installation

Installation of one 6000 gallon fuel tank. After replacing outdated facilities with environmentally safe technology.  This AV gas fueling station was installed at the Thompson Falls Airport and is currently in use.